Vertical Installations, where well drilling equipment is used, are generally more expensive, but are ideal where land is scarce. If land is limited, closed loops can be inserted into vertical bore holes, drilled to a depth of about 150 to 250 feet. U-shaped loops of pipe are inserted into the holes. The holes are then backfilled with a grout solution.